RESURFACING CONTRACT
The Township Road District has contracted with Arrow Paving to resurface the following Township roads
Oak Hill Drive (bottom of hill to 2nd intersection); Oak Hill Drive (2nd intersection west to joint); Hickory Hollow Drive (top intersection by Oak Hill to dead end); Hickory Hollow Drive (Sleepy Hollow Road to joint); Walnut Lane
Duchesne Drive (Frontenac Dr. to cul de sac); Duchesne Drive (cul de sac to dead end); Chateau Drive (east of Frontenac Dr to Twp. limit)
Hecker Drive (west end to Castle Dr); Hecker Drive (Castle Dr. east to dead end); Albert Dr (Castle to east end); Castle Ave (Albert to sout end); Baker Ave
Pheasant Trail (around inland only); Lake Shore Drive (Skyline to Old Farm Road)
PAINT PAVEMENT MARKING CONTRACT
Binnie Road (1 blk east and west of Adams Rd; Huntley Rd west to C'ville line)
Bolz Road (Williams to Twp sign/Twp begins sign to Twp ends sign)
Boncosky Road (Sleepy Hollow Rd to Twp Line)
Boyer Road (Huntley Road to Township Ends sign)
Duncan Avenue (East Dundee line to Elgin limits)
Kings Road (Skyline to Caastlewood + 200 feet)
Lake Shore Drive (Curve on norhside)
Melody Land (Willims Rd to Kings Rd)
Miller Road (Rt. 31 west to Twp Line)
Sandbloom Road (Twp begins Sign north to Twp Ends sign)
Sleepy Hollow Road (S of Boncosky Rd thru curve both sides)
Sleepy Hollow Road (Elgin line north to Sleepy Hollow Village line)
Sleepy Hllow Road (Huntley Rd north to C'ville line)
Williams Road (1/2 blk on each side of LSD)